Mismatch hold, recovery and handover

DF-GEN-01-TP-03 / DRAFT-1 / DF-GEN-01 / DEMO-01

Inert model/approved training fixture only. Not an OEM operating SOP, service release or competence certificate.

  1. Read the assigned configuration

    State DF-GEN-01 / DEMO-01 and the training draft revision.

    HOUSING · Expected: The exercise is tied to a configuration and source.
  2. Compare the proposed profile

    Inspect B against the reference for the assigned training A.

    ELEMENT_B · Expected: A visible profile difference is identified.
  3. Call HOLD

    Do not force or animate B into the housing. Stop the represented task.

    ELEMENT_B · Expected: B stays outside; progression is held.
  4. Capture the discrepancy

    Describe the conflicting profile and the source needed to resolve it.

    ELEMENT_B · Expected: The record explains the reason, not only the stop.
  5. Bring in the reviewer

    A responsible instructor checks the correct source/configuration and the proposed recovery.

    HOUSING · Expected: No automatic source or package approval is implied.
  6. Select verified training A

    Only after instructor review, identify the assigned A in the concept exercise.

    ELEMENT_A · Expected: A remains the same object; B is still separate.
  7. Inspect recovery

    Review the same-axis return in the model. An actual physical task needs its own approved operating procedure.

    ELEMENT_A · Expected: No lateral insertion or hidden-lock certification is inferred.
  8. Hand over the reasoning

    Record the configuration, mismatch, reviewer decision, evidence and unresolved items for the next exercise.

    HOUSING · Expected: An accountable review precedes any lesson or procedure update.